May is one of the easiest months of the year to get a house painted in Fort Worth. It's warm enough for exterior paint to cure well, not yet hot enough to slow crews down, and windows can stay open for interior work. It's also a natural time for a project. School is wrapping up, families are planning summer, and people selling a house are listing in spring.
The catch is that everyone else knows it too. May is a busy month for painters, and it's also storm season in North Texas. This post covers why May works so well, what to watch out for, and how to plan so your project actually happens in May instead of July.
Why May works for exterior painting
Warm, steady temperatures
Highs in the 80s and lows in the 60s are close to ideal for exterior acrylic paint. Surfaces warm up enough for good adhesion without getting so hot that paint flashes dry.
Long days
Daylight runs past 8 p.m. by mid-May. That gives each coat plenty of time to set before evening dew, and gives crews longer working days.
Wood is ready
Wood siding and trim have dried out from winter but haven't been baked by summer yet. It takes primer and paint well.
A good start before summer
Paint applied in May has a few weeks to cure before the real heat of July and August.
Why May works for interior painting
Interior painting can be done any time of year, but May has a few advantages.
If you're doing both interior and exterior, May is a good month to bundle them. We can schedule exterior work on good weather days and move inside when storms roll through. See our interior painting page.
What to watch out for in May
Storms and hail
May is one of the stormiest months of the year in North Texas. Severe storms, heavy rain and hail can roll through with little notice. We watch the forecast every day and won't start a coat if rain is likely before it sets. Expect a day or two of weather delay on most exterior jobs this time of year.
If a storm does damage your exterior, our hail damage guide explains what to check and what to do next.
Pollen
Spring pollen settles on everything. We wash exterior surfaces before painting so pollen and dirt don't get trapped under the paint.
Busy schedules
May is popular, so painters fill up. That's the biggest obstacle to getting your project done this month.
How to plan a May paint job
January to March: get estimates
This is the best time to collect quotes. Painters have more time for estimates in winter, and you have time to compare without pressure.
March: pick colors and book
Settle on colors and sheens. If you're in an HOA, submit exterior color changes for approval now. Many take a few weeks. Book a start date before April if you can.
April: prep the house
Trim shrubs back from walls, plan where patio furniture will go and think about sprinkler schedules. Our paint prep checklist covers what to do.
May: paint
Leave some slack for rain. If the job runs into early June, that's still a good time to paint.
What projects fit May best
If you can't get May
If May is already booked, don't worry. Early June still works well for exterior paint. Summer is manageable with early starts. And fall, especially October, is just as good as May for exterior work, with fewer storms. Our guide to the best time to paint a house exterior in North Texas shows the whole year.
Interior painting has no season. If your project is mostly inside, we can schedule it any month.
What it costs
Pricing doesn't change much by season. For reference:
Estimates are free and in writing.
A note about selling in spring
Spring is the busiest season for home sales in Fort Worth, and many sellers repaint before listing. If you're planning to sell, book painting early enough that it's done and dry two to three weeks before listing photos. Our post on painting your house before selling explains where to spend.
May projects we see most often
Every spring, a few kinds of jobs fill our calendar. Front-of-house refreshes come first: front doors, shutters, porch ceilings and trim, often for families hosting graduation parties. Kids' rooms come next, usually right before or after school lets out. Fences are a big one, because they take a beating over winter and look their worst in spring. And sellers fill a lot of April and May dates, painting interiors in light neutrals before listing.
If your project fits one of those, it's worth calling a little earlier than you think you need to. Smaller jobs can sometimes fit between larger ones, but full exteriors need a dedicated block of days.
What a May exterior job looks like day to day
Most full exterior repaints take about a week on a typical Fort Worth home. In May, a normal week goes like this.
We wash the house on day one and let it dry overnight. Spring pollen comes off with the dirt, so new paint has a clean surface. Days two and three are prep: scraping, sanding, caulking, replacing rotted wood and priming. Days four through six are paint. Trim, doors and shutters come last. On the final day, we walk the house with you, handle touch-ups and clean up.
Storms are the main thing that changes that plan in May. If heavy rain is coming, we focus on prep or move to interior work that day. Once the siding dries out, we pick up where we left off. We'll always tell you the night before if the next day's plan has changed.
Interior projects that pair well with spring
While a crew is already scheduled, some homeowners add interior rooms to fill rainy days. A few projects fit well in spring.
Tips for HOA approval in spring
If you live in a neighborhood with an HOA, exterior color changes usually need approval before work starts. Spring is a busy time for HOA boards too, since many homeowners are planning projects at once. Submit your colors early, include the paint brand and color names, and ask whether you need to include the trim and door colors as well. If you're repainting in the same colors, check whether you still need to notify them. We can provide color details and product sheets for your submission.
Get on the May schedule
If you want your project done in May, the earlier you reach out, the better your chances. Call or text (817) 214-7475, or request a free estimate. We'll come out, or quote from photos and video if that's easier.
May is a good month for siding and deck staining before the summer heat.
Want a professional opinion? Bearcat Painting offers free, written estimates across Greater Fort Worth. Schedule yours online or call (817) 214-7475.
Bearcat Painting is based in Aledo and works with homeowners across Greater Fort Worth, including Fort Worth, Keller, Granbury, Willow Park and Colleyville. See all areas we serve.